Site icon News Portal NP

Robot’s bid to retrieve Fukushima reactor’s melted nuclear fuel halted

Efforts to use an extendable robot to extract a fragment of melted fuel from a damaged reactor at Japan’s Fukushima Daiichi nuclear power plant were halted due to a technical problem. The retrieval of a small sample of debris inside the Unit 2 reactor was intended to kickstart the challenging fuel debris removal phase at the plant, which was severely affected by the 2011 earthquake and tsunami.

The task was paused when it was discovered that the robot’s maneuvering pipes were incorrectly positioned, preventing the mission from proceeding within the allotted radiation exposure time. Despite the setback, safety remained the top priority for TEPCO, the plant operator.

The sample-return operation aims to gather valuable data for future decommissioning strategies and technology development. Understanding the melted fuel debris is crucial for the long-term cleanup of the Fukushima Daiichi plant, although specific plans for the complete removal and storage of the 880 tons of radioactive material remain uncertain.

While challenges lie ahead, experts believe that the successful completion of the sample retrieval mission will pave the way for effective decommissioning efforts in the coming years.

© Copyright 2024 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed without permission.

[ad_2]

Source link

Exit mobile version